Fay Ave. (CoSA)

Fay Ave. (CoSA)

Role: Prime   |   Agency Client: City of San Antonio, Transportation & Capital Improvements Poznecki-Camarillo, Inc. (PCI) was contracted by the City of San Antonio for engineering, environmental, and utility coordination services in Bexar County, Texas. The...
I-35 from Guadalupe River to Comal/Hays County Line (TxDOT)

I-35 from Guadalupe River to Comal/Hays County Line (TxDOT)

Role: Prime   |   Agency Client: TxDOT, San Antonio District Poznecki-Camarillo, Inc. (PCI) was contracted by TxDOT for preliminary engineering services for the operational improvements on I-35 in New Braunfels, TX that had an overall project length of 9.5 miles. The...
Camelot Subdivision PH I (Bexar County)

Camelot Subdivision PH I (Bexar County)

Role: Prime   |   Agency Client: Bexar County, Infrastructure Services Department Poznecki-Camarillo, Inc. (PCI) provided engineering and surveying services for the rehabilitation and reconstruction of Camelot Subdivision Phase I.  The Camelot Subdivision Phase I...
Hike and Bike Trails (Boerne)

Hike and Bike Trails (Boerne)

Role: Prime   |   Agency Client: City of Boerne The City of Boerne, in cooperation with the Texas Department of Transportation (TxDOT, San Antonio District), proposed the expansion of the existing Old No. 9 Trail in the City of Boerne. The Trail System Expansion is an...
2016-2019 PS&E On-Call (TxDOT)

2016-2019 PS&E On-Call (TxDOT)

Role: Prime   |   Agency Client: TxDOT, San Antonio District PCI led PS&E documents for an indefinite deliverable contract that had 13 projects consisting of a roadway widening project, with most requiring a bridge widening or replacement. All projects were...