Callaghan from I-410 to Bandera (CoSA)

Callaghan from I-410 to Bandera (CoSA)

Role: Prime, but for Environmental Services we were on a separate On-Call Environmental Contract for the City  |  Agency Client: City of San Antonio

The City of San Antonio (CoSA), in cooperation with the Texas Department of Transportation (TxDOT, San Antonio District) proposed the expansion of Callaghan Road to four lanes with a continuous left-center turn lane and the installation of curbs, sidewalks, driveway approaches, a shared-use path, and drainage improvements within the project limits. Additional ROW was required for the proposed project. The purpose of the project was to improve mobility and operational efficiency and improve the surface and storm drainage system of Callaghan Road.

PCI was the Environmental Task Lead under contract with the City of San Antonio under a separate On-Call Environmental Contract and prepared all environmental clearances required for this project, which had federal funding. PCI prepared a TxDOT Environmental Assessment (EA) and corresponding technical reports for this project. PCI also conducted public outreach for this project, including a Public Meeting, a Public Hearing, and two Noise Workshops.

“I wanted to extend my thanks for a job well done with the public hearing a few weeks back and the two noise workshops this week.  You are all very professional, knowledgeable, and executed these events in an outstanding manner.”

Mr. David McBeth, Capital Project Manager with the City’s Transportation & Capital Improvements