Elimination Lift Stations (SAWS)

Elimination Lift Stations (SAWS)

Role: Prime  |  Client: San Antonio Water System (SAWS)

PCI was contracted by SAWS to provide on-call engineering services under the 2012 Engineering Design Services Program for various water and sewer main replacement projects. PCI provided surveying, design, and construction administration services, all civil engineering, wastewater design, force main design, pump and pump system removal, and wastewater lift station removal towards the development of construction documents for the elimination of Lift Stations 199 (Cagnon) and 200 (Hill Top).

Submit a Comment