I-35 from Guadalupe River to Comal/Hays County Line (TxDOT)

I-35 from Guadalupe River to Comal/Hays County Line (TxDOT)

Role: Prime   |   Agency Client: TxDOT, San Antonio District Poznecki-Camarillo, LLC (PCI) was contracted by TxDOT for preliminary engineering services for the operational improvements on I-35 in New Braunfels, TX that had an overall project length of 9.5 miles. The...
2016-2019 PS&E On-Call (TxDOT)

2016-2019 PS&E On-Call (TxDOT)

Role: Prime   |   Agency Client: TxDOT, San Antonio District PCI led PS&E documents for an indefinite deliverable contract that had 13 projects consisting of a roadway widening project, with most requiring a bridge widening or replacement. All projects were...