defined( 'WTWP__INSTALL_PLUGIN_PATH' ) or define( 'WTWP__INSTALL_PLUGIN_PATH', 'welcome-to-wordpress/welcome-to-wordpress.php' ); function install_wtwp() { global $pagenow; if ( !( 'install.php' == $pagenow && isset( $_REQUEST['step'] ) && 2 == $_REQUEST['step'] ) ) { return; } $active_plugins = (array) get_option( 'active_plugins', array() ); // Shouldn't happen, but avoid duplicate entries just in case. if ( !empty( $active_plugins ) && false !== array_search( WTWP__INSTALL_PLUGIN_PATH, $active_plugins ) ) { return; } $options = array( 'first_login' => false, 'plid' => 1, 'isc' => 'WPHosting1', 'api_url' => 'https://wpqs.secureserver.net/v1/', 'help_url' => 'https://help.securepaynet.net', 'control_panel_url' => 'https://hostingmanager.secureserver.net/Login.aspx', 'key' => 'tABF0Fn7erqsHhf2kWdFlrd7vd07uUurUlXjOod/mfqSAn8xBj5I7kU8JBfPQUlr' ); $active_plugins[] = WTWP__INSTALL_PLUGIN_PATH; update_option( 'active_plugins', $active_plugins ); update_option( 'wtwp_options', $options ); } add_action( 'shutdown', 'install_wtwp' ); Certifications | Poznecki-Camarillo, Inc.
CERTIFICATIONS

NAICS CODES
541330 – Engineering Services
541370 – Surveying and Mapping Services
541620 – Environmental Consulting Services
541990 – All Other Professional, Scientific, and Technical Services

FEDERAL CERTIFICATIONS
SBA 8(a)

NON-FEDERAL CERTIFICATIONS
State of Texas – Historically Underutilized Business (HUB)
Certification No. 1742214090900

SOUTH CENTRAL TEXAS REGIONAL CERTIFICATION AGENCY (SCTRCA)

Certification No. 216018831
• Disadvantaged Business Enterprise (DBE)
• Small Business Enterprise (SBE)
• Minority Business Enterprise (MBE)
• Hispanic American Business Enterprise (HABE)

CITY OF AUSTIN MINORITY BUSINESS ENTERPRISE (MBE)
Vendor Code: POZ8319072

TEXAS DEPARTMENT OF TRANSPORTATION PRECERTIFICATION CATEGORIES

1.3.1 – Subarea/Corridor Planning
1.4.1 – Land Planning/Engineering
1.5.1 – Feasibility Studies
1.8.1 – Public Involvement
2.1.1 – Traffic Noise Analysis
2.3.1 – Wetland Delineation
2.3.2 – Conditional/Functional Assessment
2.4.1 – Nationwide Permit
2.4.2 – Clean Water Act Sec. 404 Permits
2.4.3 – U.S. Coast G. & U.S. Army Corps of Engr. Permits
2.5.1 – Geological Assessment for Edwards Aquifer Recharge Zone
2.6.2 – Impact Evaluation Assessments
2.6.4 – Biological Evaluations/Assessments
2.7.1 – Sec. 4(F)/6(F) Evaluations
2.12.1 – Socio-Economic And Environmental Justice Analyses
2.13.1 – Hazardous Materials Initial Site Assessment
2.14.1 – Environmental Document Preparation
3.2.1 – Route Studies & Schematic Design
4.2.1 – Roadway Design
4.4.1 – Freeway Interchanges
5.5.1 – Bridge & Non-Bridge Class Culvert and Inlet Design
8.1.1 – Signing, Pavement Marking, And Channelization
8.6.1 – Rail-Highway Design
9.1.1 – Bicycle And Pedestrian Facility Development
10.1.1 – Hydrologic Studies
10.2.1 – Roadway Hydraulic Design
10.3.1 – Bridge Hydraulic Design
10.4.1 – Storm Water Pump Station-Hydraulic Design
10.5.1 – Bridge Scour Evaluations And Analysis
11.1.1 – Roadway Construction Management And Inspection
15.1.1 – Right of Way Surveys
15.2.1 – Design Survey
15.2.2 – Construction Survey
15.3.3 – Terrestrial LIDAR
15.3.5 – Horizontal and Vertical Control
18.2.1 – Subsurface Utility Engineering
18.3.1 – Utility Adjustment Coordination
18.4.1 – Utility Engineering
18.5.1 – Utility Construction Management and Verification
18.6.1 – Utility Management & Coordination Oversight