- December 1, 2022
- Rebecca Chavez
TxDOT – US 69 & SH 73 Turbine (Spiral) Interchange
US 69 & SH 73 Turbine (Spiral) Interchange PCI designed this featured, multi-level turbine interchange in 2020 – the second of its kind in Texas – through coordinated services in civil engineering, public involvement, and surveying. The turbine interchange was designed to replace the existing cloverleaf interchange, reducing construction cost
Read more- December 1, 2022
- Rebecca Chavez
TxDOT – I-35 Operational Improvements
I-35 Operational Improvements, from the Guadalupe River to the Comal / Hays County Line PCI was contracted by TxDOT’s San Antonio District for preliminary engineering, environmental, public involvement, and surveying services for approximately 9.5 miles of operational improvements on I-35, from the Guadalupe River to the Comal / Hays County
Read more- December 2, 2022
- Rebecca Chavez
SAWS – Water Resources Integration Program
Water Resources Integration Program (WRIP) Project 1, Segment 1, from Twin Oaks Treatment Facility to SH 16 PCI provided civil engineering and surveying services on the development of construction documents for 82,000 LF of 66-inch water main for a proposed aquifer storage and recovery pipeline along the southern portion of
Read more- December 2, 2022
- Rebecca Chavez
San Antonio – Airport Strategic Development Plan
San Antonio Airport Strategic Development Plan As subconsultant, PCI provided public involvement, environmental, engineering, and survey services for the San Antonio International Airport System’s Strategic Development Plan to look at the airport’s needs over the next 20 and 50 years. The data-driven plan included options regarding land use, facilities, and
Read more- December 2, 2022
- Rebecca Chavez
Converse – Rocket & Schaefer MPO
Rocket Lane Expansion and Schaefer Road, from E. Norris to Loop 1604 MPO Photo Credit (Above): Google Earth PCI provided civil engineering, surveying, environmental, and public involvement services to the City of Converse on the widening of Schaefer Road and Rocket Lane from a two- to a five-lane roadway for
Read more- September 11, 2022
- VP Dev
Boerne – Hike & Bike Trail
Hike & Bike Trail System TAP LG PCI was selected by the City of Boerne to design, survey, and environmentally clear the expansion of the existing Old No. 9 Trail. As its name suggests, the Old No. 9 Trail partially follows the path of a historic wagon trail for immigrants
Read more- December 1, 2022
- Rebecca Chavez
San Antonio – Main & Soledad
Main Avenue and Soledad Street, from Navarro to Commerce PCI was the prime consultant for the City of San Antonio on this downtown road reconstruction of Main Avenue and Soledad Street, from Navarro to Commerce, right through the heart of San Antonio. PCI provided land surveying, environmental, and civil engineering
Read more- December 2, 2022
- Rebecca Chavez
TxDOT/ARMA – US 281 & Loop 1604
Loop 1604 & US 281 Interchange to Stone Oak Parkway PCI provided civil engineering services, including traffic control plans and construction phase support, under two separate contracts for the multi-level US 281 / LP 1604 Interchange and the expansion of 3.8 miles of US 281 to a six-lane expressway. PCI
Read more- December 2, 2022
- Rebecca Chavez
Bexar County – Marshall Road
Marshall Road, from US 281 to Bulverde Road PCI provided engineering, surveying, and environmental services for Bexar County to widen Marshall Road to provide operational improvements, necessary drainage improvements, and bicycle/pedestrian amenities. The new roadway would include two travel lanes, a 22-foot median, bike lanes in each direction, and sidewalks
Read more- December 2, 2022
- Rebecca Chavez
Frio County – On-Call General Engineering Contract
On-Call General Engineering Contract (GEC) Main Photo (Above) Credit: Google Earth PCI provided civil engineering, surveying, and environmental services as the prime consultant to Frio County following an existing roadway and drainage structure collapse. The existing roadway served as a through road for rural traffic, limiting detour options. Due to
Read more- December 2, 2022
- Rebecca Chavez
Bexar County – VFW Blvd Drainage
VFW Blvd Drainage, Segments 1-2 PCI provided land surveying, civil engineering, and environmental services to Bexar County’s Flood Control Division for the VFW Boulevard Drainage Project. The purpose of this project would be to reduce flooding near the intersection of Roosevelt Avenue with VFW Boulevard by reconstructing the intersection to
Read more- December 1, 2022
- Rebecca Chavez
Bexar County – Dietz Elkhorn Road
Dietz Elkhorn Road, from I-10 to Fair Oaks Parkway Photo Credit (Above): Google Earth PCI was contracted by Bexar County to provide land surveying and civil engineering services to widen and reconstruct Dietz Elkhorn Road, from I-10 to Fair Oaks Parkway. During the project, it was determined the road would
Read more- December 1, 2022
- Rebecca Chavez
SAHA – Victoria Courts Redevelopment Labor & Leigh Streets
Victoria Courts Redevelopment Labor & Leigh Streets Photo Credit (Above): Billy Calzada, San Antonio Express-News Victoria Courts consisted of 660 public housing units built in the early 1940s. In the fall of 1999, San Antonio Housing Authority (SAHA) began its revitalization through a series of controversial public meetings, planning sessions,
Read more- December 2, 2022
- Rebecca Chavez
San Antonio – De Zavala Road
De Zavala Road, from Babcock to Cogburn Photo Credit (Above): Google Earth PCI provided civil engineering, land surveying, and environmental services for the widening and reconstruction of De Zavala Road from Cogburn to Babcock Road for the City of San Antonio. The project widened De Zavala Road to accommodate five
Read more